ML06001Course Detail

Potential Use of Magnetic Tomography Technology to Evaluate Dowel Placement

  • Ondemand
  • 2.00 Pdh
  • Written by - EduMind, Inc
  • Approved in 52 states / territories

Course Overview

The use of large-diameter dowel bars has been a long-standing recommendation for all jointed concrete pavements subjected to high volumes of heavy truck traffic to prevent roughness caused by faulting. It is required that the dowel bars are placed in proper position and alignment. Inadequate concrete cover can lead to steel corrosion and spalling. If the bars are not adequately centered under the joint saw cut, the bars may not be effective in providing load transfer. Misaligned dowel bars can interfere with the proper functioning of the joint, which in turn, can lead to spalling or cracking of the concrete. Severely misaligned dowel bars can also cause looseness around the dowel bars, greatly reducing their effectiveness. The importance of achieving good dowel alignment is widely recognized. The course material is based on FHWA Publication Number FHWA-IF-06-006: Use of Magnetic Tomography Technology to Evaluate Dowel Placement.

Learning Objectives

Upon successful completion of this course, learners will be able to:

  • Describe cover meters and ground penetrating radar.
  • Identify influence of technology, calibration, validation, and productivity.
  • Explain effects of cover material and testing conditions.
  • Recognize field testing procedures of dowel bars placement.

Course Writer

- EduMind, Inc

Applicable States

Approved in all 50 states, D.C., and Puerto Rico
$59.98 2.00 Pdh